The
Gaillard Cut, or
Culebra Cut, is a man-made valley cutting through the
continental divide in
Panama. The cut forms part of the
Panama Canal, linking
Lake Gatún, and thereby the
Atlantic Ocean, to the
Gulf of Panama and the
Pacific Ocean. It is 12.6 km (7.8 miles) long from the Pedro Miguel lock on the Pacific side to the
Chagres River arm of Lake Gatun, with a water level 26 m (85 ft) above
sea level.
Construction of the cut was one of the greatest
engineering feats to have been undertaken in its time; the immense effort required to complete it was justified by the great significance of the canal to
shipping, and in particular the strategic interests of the
United States.
Construction
The French
As described in
History of the Panama Canal, the excavation of the Culebra Cut was originally begun by a French venture, led by
Ferdinand de Lesseps, which was attempting to build a sea-level
canal between the oceans, with a bottom width of 22 metres (72 feet). Digging at Culebra began on
January 22,
1882. A combination of disease, underestimation of the problem, and financial difficulties led to the collapse of the French effort, and its being bought out by the
United States in
1904. The French by this time had excavated some 14,256,000 m³ (18,646,000 cubic yards) of material from the cut, and had lowered the summit from 64 metres (210 feet) above sea level to 59 metres (193 feet), over a relatively narrow width.
The United States
The
United States bought out the French work on the canal, and took over on
4 May,
1904. Under the leadership of
George Washington Goethals, the American effort started work on a wider, but less deep cut, as part of a new plan for an elevated
lock-based canal, with a bottom width of 91 metres (300 feet); this would require creation of a valley up to 540 metres (a third of a mile) wide at the top. Vast amounts of new equipment were imported, and a comprehensive system of
railways was constructed for the removal of the immense amounts of .
Major
David du Bose Gaillard, of the
U.S. Army Corps of Engineers, joined the project at the same time as Goethals, and was put in charge of the central district of the canal, which was responsible for everything between Gatun and the Pedro Miguel locks — most notably, the Culebra Cut. Gaillard dedicated himself to the job of getting the cut excavated with quiet, clear-sighted leadership, in spite of the many and complex difficulties which the work presented.
The scale of the work was massive. Hundreds of drills prepared holes in which were planted tons of
dynamite, which blasted the rock of the cut so that it could be excavated by steam shovels. Dozens of dirt trains took the spoil from the shovels to the dumps, which were some twelve miles distant. In a typical day, 160 trainloads of material were hauled away from a cut nine miles long. This required skilful co-ordination; at the busiest times, there was a train in or out almost every minute.
Six thousand men worked in the cut, drilling, placing explosives, handling shovels and the dirt trains, and shifting the tracks as the work moved forward. Twice a day work stopped for blasting, and then the shovels moved in to take the loose dirt away. More than 600 holes were fired daily; in all, 60 million pounds (27,000 tonnes) of dynamite were used. At times, 52,000 pounds (23,600 kg) of dynamite were used in a single blast.
Landslides
The excavation of the cut was one of the greatest areas of uncertainty in the creation of the canal, due to the unpredicted large
landslides. The International Board of Consulting Engineers had mistakenly decided that the rock would be stable at a height of 73.5 metres with a slope of 1 in 1.5; in practice, the rock began to collapse from that slope at a height of only 19.5 metres. The misjudgement was in part due to unforeseen
oxidation of the underlying
iron strata due to water
infiltration, which caused weakening and eventually a collapse of the strata.
The first and largest major slide occurred in 1907 at Cucaracha. The initial crack was first noted on October 4th, 1907, followed by the
mass wasting of approximately 382,000 m³ (500,000 cubic yards) of
clay. This slide caused many people to suggest the construction of the Panama Canal would be impossible; Gaillard described the slides as tropical
glaciers, made of mud instead of ice. The clay was too soft to be excavated by the steam shovels and was eventually removed by sluicing with water from a high level.
After this the sediment in the upper levels of the cut was removed, resulting in less weight over the weak strata. The slide still continued to cause minor problems after this.
Completion
Steam shovels broke through the Culebra Cut in May, 1913. The Americans had lowered the summit of the cut from 59 metres (193 feet) to 12 metres (40 feet) above sea level, at the same time widening it considerably, and had excavated over 76 million cubic metres m³ (100 million cubic yards) of material. Some 23,000,000 m³ (30,000,000 cubic yards) of this material was additional to the planned excavation, having been brought into the cut by the landslides.
Gaillard died from a brain tumour in Baltimore, on
December 5,
1913, having been promoted to colonel a month before, and hence never saw the opening of the canal in 1914. The
Culebra Cut, as it was originally known, was renamed to the
Gaillard Cut on
April 27,
1915, in his honour.
External results
Click here for more details on Gaillard Cut
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://gaillard_cut.totallyexplained.com">Gaillard Cut Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |
We see you're using Internet Explorer. Try Firefox, we think you'll like it better.
· Firefox blocks pop-up windows.
· It stops viruses and spyware.
· It keeps Microsoft from controlling the future of the internet.
Click the button on the right to download Firefox. It's free.